Spec-driven Materials Approval & QC for major infrastructure

Thousands of spec pages.
One interactive workflow.

Prioris turns normative materials and construction specifications — FHWA FP-24, HK CEDD GS, UK HA Manual of Contract Documents, Portuguese CE EP — into live compliance rules that drive Materials Approvals, Inspection & Test Plans and pouring records straight from your site tablet.

Fewer specialised engineers on the MA bench. Faster approvals. Zero missed V/NV limits.

FP-24 §552 · pre-loaded
HK CEDD GS Vol. 2 · pre-loaded
UK MCHW · pre-loaded
PT CE EP · pre-loaded
Live dashboard
552.03
Active clauses
7-day
Strength est.
V / NV
Live flagging
552-CP1Aggregate · Source conformanceLIVE
552-CP2Concrete composition · Trial mixLIVE
552-CP3Produced aggregate · GradationLIVE
552-CP4Pouring records · slump 50mm V
552-CP5Compressive strength (7→28 d)LIVE
The business case

Every hour an engineer spends copying clauses into forms is an hour not spent on engineering.

Materials Approval (MA) and Inspection & Test Plans (ITP) are the most-duplicated, least-differentiated paperwork on any major project. Prioris treats the normative spec as a computed ruleset — not a PDF — and drives every form, every acceptance check, every pour record straight from those rules.

Pain pointStatus quoWith PriorisDelta
MA cycle time4–8 hours per submittal · thousands per project30 min → 1 hour≥ 85% faster
Materials engineers per project2–4 FTE specialised0.5 FTE generalist≈ 75% reduction
Non-conformance caught at pourHours–days (paper field forms)Live, on first truckloadReal-time
Rejected pours · re-work costFull demolition + re-cast7-day strength early warning40–70% avoided
Spec onboarding200–800 pages × human readAssisted ingestion *Scalable to any spec
Payment withholdings (LDs)Frequent — no audit trailTraceable V/NV trail · audit logContract-grade evidence

* Spec ingestion workflow currently in development — will accelerate onboarding of new jurisdictions into the rules engine.

How Prioris works

From spec clause to site verdict — one rule engine.

No configuration screens. No form-builder. The normative spec itself is the configuration.

01
Apply the spec
Pick the jurisdiction and table (e.g. FP-24 §552 Concrete). Prioris loads every clause, test method, acceptance criterion and frequency into the project rules engine.
02
Auto-generate Materials Approvals
The MA form morphs per clause — Total SCM, w/cm, chloride limit, aggregate gradation — all evaluated server-side against the active clause set. The engineer reviews the decision, not the data-entry.
03
Spec-driven ITPs for QC
The same ruleset exposes a per-checkpoint ITP tree: CP1 aggregate source, CP2 trial mix, CP3 plant QC, CP4 pouring records, CP5 compressive strength. Each opens the matching data-capture surface.
04
Site technicians fill records in real time
On tablets at the point of discharge — slump, temperature, air content, sample ID. Values are tinted green / red as the technician types, using the clause's exact V/NV limits.
05
7-day strength prediction
As cube data comes back from the lab, the statistical prediction engine flags pours trending below 28-day target. Early warning reduces re-work windows from weeks to days.
06
Governance across portfolios
Platform Creator, Project Admin, EoR, RE, Contractor Engineer, Technician, Consultant, Asset Owner — role-scoped RBAC with seat limits and full audit trail. Same governance model across every asset.
Live in the app today

Real modules. Not renders.

Everything below is deployed in the current build. Request a demo and we'll walk you through each module on an actual project.

Materials Approval · FP-24 §552
The submittal drawer auto-computes Total SCM from fly ash + silica fume + slag. Cement content, w/cm, chloride limit, aggregate gradation are all evaluated live against the selected clause. Reject / approve cycles include audit trail for contractual evidence.
Auto-computed fieldsCascading Section → ClauseEoR approval trail
Quality Control · 5 control points
CP1 Aggregate source · CP2 Trial mix · CP3 Plant QC · CP4 Pouring records · CP5 Compressive strength. Each checkpoint surfaces its acceptance criteria, test method and frequency — and opens the corresponding data-capture view.
Spec-driven checkpointsRead-only evidence pagesLive data capture
Pouring Records with live V/NV flagging
Technicians log truckload by truckload: arrival time, plate, ticket, slump, temp, air, sample ID, photos. Slump 50 mm turns the cell green; temperature 40°C turns it red — instantly, before they hit Save.
Instant complianceBIM / Aconex / Dalux section IDDelivery & Placement block
Identity Testing · 7-day strength forecast
Strength forecasting engine consumes cube-break data as it lands in the lab. Forecasts likely 28-day performance, flags pours trending non-conforming early enough to isolate the batch.
Strength forecastStatistical acceptanceRe-work avoidance
Materials governance · 7-role RBAC
Platform Creator (Durable Designs), Project Admin (contractor HQ), EoR, Resident Engineer, Contractor Materials Engineer (max 2), Materials Technicians (max 5), Consultants (max 2), Asset Owner. Seat limits + audit log. Invite by email with enforced first-login password change.
Role-scoped actionsProject-level seat limitsAudit-log evidence
Portfolio-wide dashboard
Client-side oversight across every asset in the portfolio: open MA submittals, open NV events, pour volume today, upcoming ITP activities. One pane across portfolio, asset, zone, element.
Multi-projectOwner/RE viewExport-ready
Live examples

What it actually looks like.

Real outputs pulled from the deployed app. Left: a Materials Approval sheet for FHWA FP-24 §552 Class P concrete with live V/NV flagging. Right: a 7-day compressive strength forecast with uncertainty bounds.

MA · FHWA FP-24 §552
Class P concrete · submittal MA-0041
Structural deck · 30 m³ · producer CEMEX · mix ref P35-15F
REJECTED · EoR revision requested
Compliance fieldValueSpec limitV/NV
Minimum 28-day strength, f'c35 MPa≥ 35
Cement content380 kg/m³≥ 335
w/cm ratio0.42≤ 0.44
Fly ash (SCM)150 kg/m³
Silica fume (SCM)15 kg/m³
Slag (SCM)250 kg/m³
Total SCM (auto-sum, % of binder)415 / 795 = 52.2%≤ 50
Max chloride (Class P · % cement wt.)0.08≤ 0.06
Air content6.5 %5 – 8
Coarse aggregate · gradationAASHTO No. 57
Fine aggregate · FM2.822.3 – 3.1
9 V · 2 NV · auto-computed Total SCM · EoR comment: "Total SCM exceeds 50% cap (AASHTO M 240 type IP/IS). Chloride ion 0.08% over Class P limit of 0.06%. Please re-trial."
QC · CP5 · Strength forecast
Measured 7-day · projected 28-day cloud
Mix P35-15F · 7 cube samples · target f'c = 35 MPa
1 pour trending below target
Early warning email sent to plant manager
20253035404550Target f'c = 35 MPaP1P2P3P4P5P6P7f'c (MPa) · measured 7d □ & projected 28d ○Pour ID (Monday cycle · FP-24 §552.10)
7-day measured (cube break) 28-day projected (mean) 95% confidence cloudStatistical update (probability)
On track (6) At risk (0) Below target (1)
P5 flagged below target at day 7 — the 28-day confidence cloud dips under f'c=35 MPa for the entire CI envelope, triggering an alert to the Resident Engineer 21 days before the 28-day cube break.

Both surfaces are spec-driven: column set, acceptance bands and statistical priors come from the applied FP-24 §552 table — not from hand-coded logic.

Who gains what

Value by stakeholder.

Prioris is adopted at the project level, but the value accrues across the full delivery stack.

StakeholderPrimary valueHeadline KPI
Asset Owner / GovernmentContractual evidence of conformance. Audit trail on every MA and pour.Zero-dispute hand-over
Engineer of RecordFocus on engineering decisions, not spec transcription. Approvals in hours.≥ 90% MA cycle-time cut
Resident Engineer / PMLive view of site conformance. Instant NV alerts at point of discharge.Real-time NV detection
Contractor · Materials EngineerNo more manual RAM typing. Lower headcount, same throughput.≈ 75% FTE reduction
Contractor · TechnicianTablet-first pour logs. Green/red typing flags reduce re-work.40–70% re-work avoided
Testing ConsultantView + comment across MA and QC with scoped RBAC.Scoped advisory access
Normative coverage

Pre-loaded country specifications.

The spec library ships with major concrete specifications already modelled as computed rules. New contractual specifications can be onboarded quickly, with additional automation in development.

US
FHWA FP-24
United States · Federal Highways
Concrete §552 (MA + ITP live)
HK
HK CEDD GS
Hong Kong · Civil Engineering & Development
Concrete Vol. 2 §16 + Marine §21 (MA live, QC Q2)
UK
UK MCHW
United Kingdom · Highways Agency
Concrete Vol. 1 §1700 (MA live)
PT
PT CE EP
Portugal · Infraestruturas de Portugal
Caderno Encargos · Betões (MA live)
Steel · ASTM / BS
Coming Q2 — Rebar, plate, bolts
Source approval + mill certificate compliance
Asphalt · Superpave / HKCEDD
Coming Q3 — bituminous
Mix design + plant QC
Upcoming · Spec ingestion workflow
Prioris is evolving toward faster onboarding of project specifications into the rules engine, including assisted extraction of clauses, test methods, limits and frequencies. Currently in development.
Who it's for

Built for major infrastructure projects.

Highway infrastructure · tunnels · marine works · rail · high-rise. Anywhere the spec matters and the volume is too big for paper-based MA / ITP.

Government road admins
Contract-grade evidence of supplier & contractor conformance across every asset in the portfolio.
Main contractors
Lower materials-engineering headcount. Faster RAM cycles. Transparent site NV resolution.
Engineers of Record
Approve on the engineering substance, not the paperwork. All decisions leave an audit trail.
Resident / Project Managers
Live conformance view. Intervene on the first truckload, not after a failed 28-day cube.
Product roadmap

What's next.

Current momentum — shipped, shipping, planned.

Shipped
  • FP-24 §552 MA + QC (5 control points)
  • HK CEDD GS Vol. 2 §16 MA
  • UK MCHW Vol. 1 §1700 MA
  • PT CE EP Concrete MA
  • 7-day strength forecast
  • RBAC (7 roles + audit log)
  • Resend onboarding emails
Shipping
  • HK CEDD §16 QC control points
  • Spec ingestion workflow (in development)
  • Steel MA + ITP (ASTM / BS)
  • Branded email templates
  • Audit log viewer UI
  • Multi-project switcher
Planned
  • Asphalt MA + QC
  • AI Review Agent (rebuttals + draft comments)
  • Sensors & Monitoring module
  • Reporting engine
  • Mobile offline capture
Request a demo

See Prioris on your project.

Tell us a bit about your role and what you're trying to achieve — we'll tailor the 30-minute walkthrough to your context.

Full name *
Work email *
Company / organisation
Phone (optional)
I am a… *
What are you trying to achieve? *
When would you want to deploy?
Anything else to tailor the demo?
© 2026 Durable Designs · Prioris is a registered mark.

DURABLE DESIGNS

Durable Designs

A multidisciplinary consultancy combining material science, techno-economic analysis, and intelligent digital tools.

Durable Designs is a trading name of Concrete Control LLC. We specialize in materials engineering, durability and service-life modelling, and value-for-money / benefit-cost analysis for infrastructure and built-environment projects.

© 2026 Concrete Control LLC. Durable Designs is a trading name of Concrete Control LLC.

We use cookies to analyse site traffic and improve your experience.

Non-essential cookies are blocked until you give consent.